Wednesday, April 30
Today, I started by typing info we had from looking around the IDF in Ford Hall into an Excel spreadsheet again for the E911 project. After that, we went back into the IDF, traced some more cables from switches to patch panels, and made notes of what was turned on, off, or empty ports. After that, we started to verify that these patch panels and things connected to them were in the room our info said. Then, to finish off the day, we had another meeting with electricians and HVAC managers about a metering project and about how the network configuration is going to be set up.