Today, I started by configuring NAT rules for a firewall that uses a VPN tunnel to remote sites, specifically for the firewall rules I set up last week. Then I attended a meeting discussing meters throughout the campus, mainly focusing on sharing thoughts and concerns about the ongoing construction. Then, to finish the day, we were figuring out which ports on a switch were hot, cold, and had nothing plugged into them. After determining these, we went to every cold port and verified that nothing was plugged into that jack, and if that was the case, we are going to pull it from the switch. Did ran into an issue, which was that some jack wall plates were mislabeled. This took a while to figure out, but it was figured out nonetheless.